This project was a task, and a daunting one at that. Syncon, Inc. was contracted to handle a distribution facility of 500,000 SF. The tenant had expectations for the project to have everything be “like new”, which would need to be completed within a 90 day period. This included the flooring, all MEP upgrades, new paint and walls, ceilings, pipes and the demolition and replacement of the fire suppression system as well as the breakdown of the current wall system that had previously separated four different tenant spaces. After surveying the floor, we realized we had a newer and bigger challenge which presented a new and possibly difficult task. The flooring was covered in 80-100 Mils of heavy duty industrial epoxy that was in place for well over ten years.